Construction organizations of Kharkiv region began the construction of strong points on the boundary line with the Donbas, without waiting for the allocation of public funds, said the Governor Ihor rainin.
"We are currently on behalf of the President of Ukraine engaged in the construction of the front line within Luhansk, Dnipropetrovsk And Donetsk regions, where There is a line of collision, And are to be constructed. And for the Kharkiv region 31 is standing structure within the Luhansk region, the government allocated funding. There is a certain procedure of state money, And these funds will be a little later, need to work now, then, what We don't have time. We asked all Construction organizations to form teams And as long as without the means to go And start this construction under our coordination, "said the rainin the Ukrainian television, informs RIA" Novosti ". According to his statement, " no construction organization Kharkiv region did not refuse ". He also explained that it would be built " not a Wall, but a platoon strong points that will be along the line of collision, And built there will be only about 300 ". The main will be constructed in Kharkiv, Zaporizhzhya And Dnipropetrovsk regions. Remember, on 14 March, the head of Ukraine Petro Poroshenko told in persistent form as soon as possible to build commandos defense in the Donbas." Each region needs to make its own contribution in fortification work, if We do not wish to meet the enemy in their own city, " He said. At the same time Poroshenko has approved the plan for the construction of fortifications. At the end of February, Commissioner Central office of the engineer troops of the military might of Ukraine Vadim Sakado stated that in the area of military operation fully built two lines of defense, the third line will be held by the administrative boundary line with the Donetsk And Lugansk regions. Before the Ukrainian authorities have decided to postpone the implementation of the project "the Wall" on strengthening the border with Russia, as approved by the contractor of the project was the Ministry of infrastructure of Ukraine, but later "the Wall" was transferred to the State border service.
10px
sections: Politics |