For 5 days 120 apartments stay without heating in Poronaisk town of Sakhalin.
4 tons of pipes of various diameter, radiators, bolts, lagging were given from reserves of Sakhalin oblast for liquidation of the breakdown. Emergency brigades warm deep-frozen stanchions up, change broken radiators in damaged houses. All repair works will supposedly finish within 2 days.
The damage took place on January 5, when the bolt broke down in one of heating main. In order to change the bolt, hot water supply was cut off. With temperature being 20 degrees below zero latter measure resulted in frost penetration of pipe run, pipe fracture and stop of boiler-house. 21 multi-storied houses remained without heating supply. For 5 days heating systems were restored in 20 houses.
sections: Accidents, Region News regions: Far East region |