<a href=NEWS.rin.ru'><a href=NEWS.rin.ru'> NEWS.rin.ru 
7 of October, 15:42

Roads of Samara caused the inspection of the activists of the popular front Roads of Samara caused the inspection of the activists of the popular front. The asphalt was deteriorating. A repair under warranty, the road is not in a hurry.

Pass the pedestrian crossing and rests in a dirty mess. For Samara is not uncommon. So that was the reason for the inspection of the activists of the popular front. According to the documents all of these objects allegedly handed over and accepted. Social activists propose to make such contractors into the black list and prevent them to contracts in the future. But law that is allowed, yet.

Not better things with the roads. In Samara for 3 years they are being reconstructed. According to local authorities, fully ready 5 roads almost completed about a dozen. To check how well repaired the road in Samara, not far to seek. Enough to go to the city center: this area was reconstructed 3 years ago.

That is the warranty still 2 years. But in some places the road slipped. How this happened becomes clear in just a couple of meters. Crooked workers cut the layers of asphalt and not even cleaned it of debris started to do the layout. This is a flagrant violation. As stated by city officials, negligent contractors systematically punish the ruble.
sections: Society, Region News, Accidents

    Copyright © RIN 2005-