<a href=NEWS.rin.ru'><a href=NEWS.rin.ru'> NEWS.rin.ru 
30 of May, 15:47

Kerch bridge building 2500 builders The construction of a bridge across the Kerch Strait has become one of the most ambitious engineering projects in the history of modern Russia. It involves more than 2,500 builders.

Centimeter by centimeter 1000 is driven in the first pile of the future bridge. From the Crimea it will keep above ground railroad. A project that has no analogues in Russia, requires the use in the construction of all possible types of piles.

The shape of the future bridge are clearly visible from a height. Concrete pillars to drive the entire length of the bridge simultaneously 8 sites. In the Crimea and the Kuban, the implementation of the project required to create from scratch driveways, storage areas, concrete mini-plants and shift camp.

Engineers, welders, bridge builders. Grandiose transport passage, a length of 19 km, is building virtually all of Russia. 2,500. Most are local residents, which this project has given not only hope but also work.
sections: Economics

    Copyright © RIN 2005-