Restoration of existing generating capacity have plans to conduct in the Crimea, it will give additional 200-250 megawatts, said Last news Commissioner Plenipotentiary of the President of the Russian Federation in the Crimean Federal district Oleg Belaventsev. according to his statement, on the issue of energy independence of the Crimea produced a complex solution. "most importantly, this Reconstruction of existing generating capacity of wind turbines, solar panels and gas-fired power plants. The reconstruction will allow the Peninsula to receive additional 200-250 MW, " said the Belaventsev. in addition, according to his statement, will be made fresh energy capacity of two thermal power stations in Simferopol and Sevastopol, four turbines which will give the Peninsula to 940 megawatts, constructed an energy bridge across the Kerch Strait, allowing the flow from the UES of Russia in the power system of the Crimea in excess of 350-400 MW. Crimea today is 70% dependent on the supply of electric power c of Ukraine.