The capacity of the Simferopol CHP after recovery will be increased by 50 MW
Simferopol power plant will double the production of electrical energy Before the end of the week, after the conclusion of the restoration of the second turbine, said Last news 1st Deputy head of the Board of the organization "Krimtech" Taras a Whole.
last Friday in the Kherson region have been undermined by power transmission towers supplying electricity to the Crimea, at the present time the supply of electricity to the Peninsula from Ukraine is completely finished. Supporters of the blockade of Crimea in Ukraine do not allow repairmen to damaged power lines supports. Review of the Crimean authorities, the energy blockade of the Peninsula are the leaders in Russia of unregistered organization " the Mejlis of the Crimean Tatar people ", such as Mustafa Dzhemilev. Before he launched the food blockade of the Crimea and openly called for the cessation of its supply. Against him in Russia prosecuted under the criminal code, 5 years denied entry to the Russian Federation in connection with the extremist statements.
"today in Simferopol CHP plant works the first turbine, generates 48 MW. Before the end of the week will be finished the repair of the second turbine of 50 MW will be developed further, " - said A.
In addition to the Simferopol CHP Firm operates Saki CHP, the generated power is 14 MW, said a Whole. After a few days on the station will raise a generation for another 5-6 MW, nourish the hope in the organization.
A more complex situation exists on the oldest Cane-Burunskiy CHP (Kerch). According to the Ministry of energy of the Russian Federation, on the evening of Sunday, the capacity of electric power generation at the station was 6 MW. At the station renovations of the first turbine, which must be completed at the beginning of winter. In the end, Kerch, with a population of 145 thousand people today experiencing the maximum shortfall in the supply of energy.
Read more about news of the Crimea
Follow the development of events in Crimea left without electricity, in an online report