The energy system of the Crimea will require a comprehensive modernization on the example of the one that was held in the Krasnodar region before the Olympics, said Last news Deputy Minister of energy of the Russian Federation Andrey Tcherezov. "Energy of the Crimea, most of the distribution network, long requires a planned systematic approach of restoration. It is necessary to do the program, for example, how was the program in the Kuban before the Olympics to improve reliability, " said Cherezov. according to his statement, then the implementation of the modernization program has enabled a ten-fold increase reliability of the energy system of Krasnodar region. Ivan noticed that the electrical network on the whole territory of the ancient Crimea, reconstruction and modernization have not been conducted. The former masters in the person of DTEK "Krymenergo" funds in the development not put. "We did the analysis, the last three or four years generally there injections were no ", - noted Ivan. according to him, most of the mains in the Crimea was built mostly in the post-war period and are at the limit of their capabilities, resulting in large losses during electric power transmission and wear. before the Crimean authorities nationalized the Crimean enterprise is a monopolist on the market of supply of electric power DTEK " Krymenergo ", included in the holding DTEK, owned by Ukrainian oligarch Rinat Akhmetov. last Friday in the Kherson region of Ukraine were undermined by power transmission towers supplying electricity to the Crimea, at the present time the supply of electricity to the Peninsula from Ukraine is completely finished. In Crimea introduced a state of emergency, schedules of emergency shutdowns of electricity and water supply. For the life of the inhabitants of the Crimea in the conditions of the electric power shortage and rolling blackouts on the Peninsula are delivered to power generators. Read more about news of the Crimea