The Russian and Chinese part of the bridge Blagoveshchensk-Heihe across the Amur river docked During the ceremony, the builders 2 countries have the bolts on the locking block and reported the successful completion of the operation, reports journalist Last news From the event. in the ceremony of docking With the Russian side was attended by Deputy Prime Minister, presidential Plenipotentiary envoy to the far Eastern Federal district Yuri Trutnev, the head of the Ministry for development of Russian Far East and the Arctic Alexander Kozlov, the Governor of the Amur region, Vasily Orlov, Director of the branch of the organization With limited liability for the development and construction of a bridge "Amur Heilongjiang" Eugene Korolkov. During the ceremony, joining in the middle of the Amur river, which forms the Russian-Chinese border, stood guard boats a couple of countries. They launched the green flares As the symbol of the open road. the construction of the TRANS-border transition started in the early winter of 2016, the Annunciation district of the Amur region, and was carried out at the same time With 2 banks. As he said at the ceremony, joining Alexander Kozlov, the bridge is expected to enter into use in April 2020. length of the Russian part of the bridge is 540 meters, it will maintain 13 kilometers of access roads that are being built From scratch. The Chinese part of the bridge is in conjunction With the roads 5, 9 kilometers. During the day, its capacity will be 630 trucks, bus 164, 68 cars and about 5, 5 thousand people. Construction is underway on the terms of the concession contract, on a parity basis for the construction of the object has been created Russian-the Chinese Firm. <span style="color:darkgray