The authorities plan to resume the infrastructure controlled by the Central government lands of Donbass. Kiev has calculated that on similar work costing more than 2 billion dollars. Finance Minister of Ukraine Oleksandr Shlapak said that first of all restoration Affairs in early December, will convene an international donor conference aimed at finding the necessary funds. Projects regeneration destroyed in the process of mopping up the houses of Donbass adept Kiev said in Washington during a meeting with reporters. "If to claim the territory, which is controlled by Ukraine, according to unconfirmed estimates for its regeneration will require about 2 billion dollars. To the donor conference, which we expect in December or in the city, or in Brussels, the Ukrainian side will have the design ready," Minister "UKRINFORM". Note that the head of economic Affairs of Ukraine said that it is about to start resuming water, electricity, gas pipelines, "crippled" housing. Together with this, he said, is worse with that part of Donbass, which is in uncontrolled Ukraine area. Adept office said that to restore or to improve life in this area Kiev doesn't even count. With all this, Alexander Shlapak stressed the importance of the regeneration of industry in the Eastern regions. "We could begin to restore yenakiieve plant, plant Alchevsk, even the owners are willing to join this, but at the moment there is simply no access to these firms, and when such a possibility appears - there is still no answer," said the official. Answering the question in which form the Ukrainian side expects to obtain financing for the renewal of Donbass, the Minister of Finance indicated that it may even be loans or grants. "If this will be the loans in the same format that we receive from the international economic institutions, the price of which is less than 2% per annum, for a period of up to ten years, we can afford it," Shlapak said.