<a href=NEWS.rin.ru'><a href=NEWS.rin.ru'> NEWS.rin.ru 
7 of December, 23:27

"Ukrenergo ": the supply of Crimea restored in a few minutes
The supply of electric energy to Crimea on line Kakhovka-Titanium will resume in the next few minutes, said on air of the TV channel, the acting Director of Ukrenergo Vsevolod Kovalchuk.

the head of Ukraine Petro Poroshenko have said before, that the emergency power supply of the Crimea one of the 4 branches will be restored in the near future. Thus the people's Deputy of the Verkhovna Rada said that the Supporters of the blockade of the Crimea have agreed on the supply of electrical energy along the previously de-energized high-voltage line " Kakhovka-Titanium ". For its part, the Commissioners banned in Russia Ukrainian extremist organization "Right sector" on the night of Monday foiled an attempted repair crews do not fully restore electrical energy to the Peninsula. On the first day of the week, the brigade power companies were allowed to object.

"as of now all the action is completely finished, given commands to start the lines, we are currently waiting on the completion of switching on the substation "Titan" and substation " Kakhovska ". In the near future, literally in a few minutes, a partial supply of the Crimea will be restored from the territory of Ukraine ", - said Kovalchuk.

The power system of the Crimea more than a week worked in stand-alone mode after the night of November 22, as a result of undermining 2 the transmission towers in the South of Ukraine completely. In Crimea and Sevastopol, imposed a state of emergency, schedules of emergency outages, the company to save electrical energy were stopped. Supporters of the blockade of Crimea in Ukraine did not allow repairmen to damaged power lines supports.

2 December head of the Russian Federation Vladimir Putin arrived in the Crimea and has launched the first phase of the power bridge from the Krasnodar region through the Kerch Strait, which gave the Peninsula a further 230 MW, until December 20 will be another 230 MW, which will allow us to significantly reduce the shortage of electrical energy. The second phase will provide an opportunity to increase the power flow to 800-840 MW - its completion is expected until the summer of 2016.

Read more about news of the Crimea

sections: Politics

    Copyright © RIN 2005-