<a href=NEWS.rin.ru'><a href=NEWS.rin.ru'> NEWS.rin.ru 
28 of March, 15:32

In the Urals began construction of the road in the village of Serebrianka In the Urals began construction of the road to the village Serebryanka, which in spring and autumn because of the thaw is cut off from the mainland. Because of this, sometimes local residents remain without pensions and products. The situation changed when the problem was recognized by the President.

The builders are preparing for a big repair. As soon as the snow melts, the road sections with poor soil will begin to dig and to fill in solid rock. Her pre-harvest on roadsides. Before this you need to restore the system of drainage so that melt water does not erode new pits.

The only road that connects the remote Ural village with civilization, in spring and in autumn turns into an impassable swamp. On the way to the village of stuck cars, trucks with food and medical aid. Nearly a thousand residents from year to year remained cut off from the world. Global reconstruction started only after bringing the road to the right, ordered by Vladimir Putin. The problem the road to a small village, the local authorities tended to just close my eyes. As a joke by the villagers, district authorities sitting in Tagil, and this, according to the index, Europe, and the silverfish is in Asia.

For several decades, one of the officials in the village visited. 400 rye loaves, 50 white loaves, sweet buns - strategic reserve bread for silverfish for a week. For day to day in the Urals will start the spring thaw. After the instructions of the President of the local officials found the money not only on repairs, but also for the construction of the fire depot, which was built 2 years ago.
sections: Society, Region News

    Copyright © RIN 2005-