<a href=NEWS.rin.ru'><a href=NEWS.rin.ru'> NEWS.rin.ru 
4 of December, 09:04

In the Crimea have established all the props road part of the bridge The builders of the bridge across the Kerch Strait has set all the Props road his part, said the information center " Crimean Bridge ". The support under the iron the road ready half.

Of the 288 pillars 85 are in the sea, which its construction was the most time consuming. At the base of the supports under the highway plunged more than three thousand piles.

the representative of the customer of construction, the head of fku uprdor "Taman" Rosavtodor Roman Novikov said that the deck of the road part of the bridge has already collected 95%. The sea section from Tuzlanskog braids to the island of Tuzla Assembly spans was carried out by lateral sliding. At sites from the island to fairway and from fairway to Kerch shore spans are constructed by the method of longitudinal sliding: the thread is collected on land and then promote with the help of jacks.

"We effectively used the summer-autumn period, and among them, conducted the installation of the arches of the Crimean bridge and brought the thread spans under the road close to the Seine estuary site ",
sections: Politics

    Copyright © RIN 2005-