<a href=NEWS.rin.ru'><a href=NEWS.rin.ru'> NEWS.rin.ru 
12 of July, 10:04

Completed laying of railway tracks to the Crimean bridge from the Kuban The builders laid more than 80% of the permanent way of the railway in the Kuban, which will connect the Crimean bridge with the transport system of the Russian mainland, said the information center " Crimean bridge ".

The double-track approach from the Taman Peninsula build of tie-rail lashes length of eight hundred meters. They are placed in a line on a prepared firm surface (a ballast layer of sand and gravel) and connect.

It is noted that the path is being built continuous method.

"This so-called Indian way of rail lashes
sections: Politics

    Copyright © RIN 2005-