<a href=NEWS.rin.ru'><a href=NEWS.rin.ru'> NEWS.rin.ru 
5 of November, 13:50

About 7 billion rubles will be spent on modernization of 7 border in the Crimea
The development of a single integrated management system checkpoints across the state border in the Crimea will begin in 2015 and End in 5 years, said the head of Rosgranitsa Konstantin Busygin.

according to him, 7 posts: 3 car, two rail and two air located in the area of the Republic of Crimea, will be capital modernized by 2020." in the program of socio-economic development of Crimea for these purposes is provided by 6, 9 billion. The main objectives two major erection of all crossing points to provide security and to increase the capacity, " said Busygin.

according to forecasts Busygin, the number of road transport crossing border crossing points on the border of the Crimea and Ukraine, will over time increase. Today, through all the border points of the Crimea in both directions takes place up to a thousand cars a day. Capital construction and Equipment with the latest technology Crimean checkpoints will begin the most important thing with three road points: " Armyansk, Dzhankoy " and " dig out ".

Modernization of air checkpoint at the airport of Simferopol will be held at the same time with them, in the long term the challenge is to make the same checkpoint at the airport Belbek. Equipment 2 railway border crossing points on the Armenian and Dzhankoy directions will End by 2020.

According to Dr. tasks for capital equipment of sea-crossing points of the Crimea will be delivered later.

sections: Politics

    Copyright © RIN 2005-